CO93-SPEEDWAY BLVD over I-20

EXIT 173 (EASTABOGA) · County 121, Alabama · Built 1965 · 2 Lanes · 3,261 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008546
Year Built
1965
Length
81.1 m (266.1 ft)
Max Span
22.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
3,261
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,625,000
Total Project Cost
$1,788,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.