CO 97/AIRPORT RD. over I-20

5.0 MI E JCT SR 77 · County 121, Alabama · Built 1965 · 2 Lanes · 596 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008542
Year Built
1965
Length
80.8 m (265.1 ft)
Max Span
22.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
596
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,620,000
Total Project Cost
$1,782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.