HEGIA BURROW RD over CAMPBELL COVE BRANCH

0.6 MI E JCT CO RD 155 · County 089, Alabama · Built 1963 · 2 Lanes · 250 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
008089
Year Built
1963
Length
11.9 m (39 ft)
Max Span
4 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$645,000
Total Project Cost
$710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.