SR 53 over TENNESSEE RIVER

MORGAN-MADISON CO LINE · County 103, Alabama · Built 1965 · 2 Lanes · 10,175 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
008809
Year Built
1965
Length
623.9 m (2046.9 ft)
Max Span
109.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
10,175
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,117,000
Total Project Cost
$15,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.