ELBO PORTER ROAD over WARRIOR RIVE-LOCUST FORK

1 MI S FLAT TOP ROAD · County 073, Alabama · Built 1962 · 2 Lanes · 3,820 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
007723
Year Built
1962
Length
187 m (613.5 ft)
Max Span
30.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
3,820
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,845,000
Total Project Cost
$4,230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.