I-22 over BNSF Railroad

I-22 over B * N RR MM 80 · County 127, Alabama · Built 2004 · 3 Lanes · 25,062 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
018269
Year Built
2004
Length
107.6 m (353 ft)
Max Span
42.7 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
25,062
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,637,000
Total Project Cost
$5,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.