3RD AVE SW over DRY BRANCH

JCT 3RD AVE * DRY BRANCH · County 103, Alabama · Built 1962 · 2 Lanes · 2,029 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
007716
Year Built
1962
Length
9.4 m (30.8 ft)
Max Span
3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,029
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.