CENTRAL PARKWAY over DRY BRANCH

400 FT S OF 3RD ST SW · County 103, Alabama · Built 1983 · 4 Lanes · 16,487 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
013031
Year Built
1983
Length
12.8 m (42 ft)
Max Span
3.4 m
Width
35.3 m (115.8 ft)
Lanes
4
Daily Traffic
16,487
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,297,000
Total Project Cost
$1,427,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.