CAMP COLEMAN ROAD over CAHABA RIVER TRIBUTARY

BEFORE JCT WINDSONG DR · County 073, Alabama · Built 1994 · 2 Lanes · 240 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
007170
Year Built
1994
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
240
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$957,000
Total Project Cost
$1,053,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.