COUNTY ROAD 55 over MULBERRY RIVER

4 MI N OF BLOUNTSVILLE · County 009, Alabama · Built 1959 · 2 Lanes · 805 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006571
Year Built
1959
Length
79.2 m (259.8 ft)
Max Span
21.3 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
805
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,469,000
Total Project Cost
$1,616,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.