US 278; SR 74 over STREAM

0.8 MI W JCT SR91 * US278 · County 043, Alabama · Built 1941 · 2 Lanes · 6,842 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
002595
Year Built
1941
Length
6.4 m (21 ft)
Max Span
3.2 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
6,842
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$527,000
Total Project Cost
$580,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.