US 82 over CAMPUS DR

0.5 MI W JCT SR 215 · County 125, Alabama · Built 1959 · 2 Lanes · 48,953 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006555
Year Built
1959
Length
48.8 m (160.1 ft)
Max Span
15.2 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
48,953
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,332,000
Total Project Cost
$1,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.