AL 139 over NS RR Active

ASHBY · County 007, Alabama · Built 1958 · 2 Lanes · 1,702 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006387
Year Built
1958
Length
54.3 m (178.1 ft)
Max Span
12.8 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,702
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,416,000
Total Project Cost
$1,558,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.