AL 25 over MAHAN CREEK

1.0 MI S SHELBY CO LINE · County 007, Alabama · Built 1928 · 2 Lanes · 4,371 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
002564
Year Built
1928
Reconstructed
1941
Length
80.2 m (263.1 ft)
Max Span
16.2 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
4,371
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,795,000
Total Project Cost
$1,975,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.