US 11 over L&N RR (ABANDONED)

CAFFEE JCT · County 125, Alabama · Built 1957 · 2 Lanes · 5,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
005799
Year Built
1957
Length
58.5 m (191.9 ft)
Max Span
12.2 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
5,250
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,654,000
Total Project Cost
$1,819,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.