North Main St. over DOlive Creek

1.5 MI. N. US 98 · County 003, Alabama · Built 1955 · 2 Lanes · 4,388 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
005324
Year Built
1955
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
4,388
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,319,000
Total Project Cost
$1,451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.