US 90 over ESLAVA CREEK

2.0 MI E I-65 · County 097, Alabama · Built 1952 · 6 Lanes · 18,012 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
004319
Year Built
1952
Length
26.8 m (87.9 ft)
Max Span
3.7 m
Lanes
6
Daily Traffic
18,012
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,575,000
Total Project Cost
$2,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.