SR4/US78 over COLDWATER CREEK

4.2 MI EAST JCT SR 202 · County 015, Alabama · Built 1952 · 2 Lanes · 9,834 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
004276
Year Built
1952
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
9,834
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,403,000
Total Project Cost
$1,543,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.