CECILE DRIVE over COLDWATER CREEK

Cecile Dr/.1 mi N US78 · County 015, Alabama · Built 1936 · 1 Lanes · 525 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
001370
Year Built
1936
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
525
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$209,000
Total Project Cost
$230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.