NORTHSIDE ROAD over NORTH RIVER

2.4 MI E OF JCT US NO 43 · County 125, Alabama · Built 1948 · 2 Lanes · 650 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
003357
Year Built
1948
Length
92.7 m (304.1 ft)
Max Span
24.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,683,000
Total Project Cost
$1,851,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.