US 231 over BRANCH

CROPWELL · County 115, Alabama · Built 1941 · 2 Lanes · 6,860 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
002584
Year Built
1941
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
6,860
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$304,000
Total Project Cost
$334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.