AL-53 (US-231) over KELLY CREEK

1.4 MI SO ST CLAIR CO LN · County 117, Alabama · Built 2017 · 2 Lanes · 4,370 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
019720
Year Built
2017
Length
169.2 m (555.1 ft)
Max Span
42.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
4,370
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,564,000
Total Project Cost
$6,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.