US 11 over WARRIOR RIVER RELIEF

3.3 MI N WARRIOR RIVER · County 125, Alabama · Built 1941 · 2 Lanes · 3,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
002538
Year Built
1941
Length
28.5 m (93.5 ft)
Max Span
6.1 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
3,700
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.