US 43 over BOONE CK

3.0 MI S FAYETTE CO LINE · County 125, Alabama · Built 1923 · 2 Lanes · 2,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
002090
Year Built
1923
Reconstructed
1995
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,950
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$597,000
Total Project Cost
$657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.