NEW HOPE CED PNT over POND CREEK

.2 MI. NE POP. RIDGE RD(3 · County 089, Alabama · Built 1938 · 2 Lanes · 825 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001877
Year Built
1938
Length
8.5 m (27.9 ft)
Max Span
4.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
825
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$249,000
Total Project Cost
$274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.