NEBO RD over POND CREEK

0.1 MI E FAS RT 01 · County 089, Alabama · Built 1938 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001837
Year Built
1938
Length
9.8 m (32.2 ft)
Max Span
3.7 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
400
Material
Masonry
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$249,000
Total Project Cost
$274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.