9TH STREET over GM * O RAILROAD

9TH ST * 29TH AVE · County 125, Alabama · Built 1938 · 4 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001805
Year Built
1938
Length
39 m (128 ft)
Max Span
13.1 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
29,000
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,828,000
Total Project Cost
$2,011,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.