AL-118 over Camp Spring Branch

AL-118 MP 38.3 · County 127, Alabama · Built 1925 · 2 Lanes · 1,050 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000305
Year Built
1925
Reconstructed
1934
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,050
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$405,000
Total Project Cost
$446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.