WYO 132 over Mill Creek
Ethete South · County 013, Wyoming · Built 2015 · 2 Lanes · 2,082 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.945267, -108.794858
This bridge is in worse condition than 23.9% of bridges in County 013. The average bridge in Wyoming is 0 years old; this one is 11 years old.
Nearby Bridges
IRR BIA RTE 16 over COOLIDGE CANAL
Built 1979
Fr Cnty Rd 334 over Coolidge Canal
Built 2012
US 287 over Popo Agie River
Built 1961
US 287 over Trout Creek
Built 1962
IRR BIA RTE 33 over COOLIDGE CANAL
Built 1994
IRR BIA RTE 20 over MILL CREEK
Built 2010
Fr Cnty Rd 335 over Coolidge Canal
Built 1999
IRR BIA RTE 25 over TROUT CREEK IRRIG CANAL
Built 1984
IRR BIA RTE 11 over POPO AGIE RIVER
Built 1992
US 287 over Little Wind River
Built 1963
Bridge Details
- Structure #
- MKW
- Year Built
- 2015
- Length
- 21.3 m (69.9 ft)
- Max Span
- 20.6 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,082
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.