Na Cnty Rd 319 over Casper Canal

Oregon Trail Road · County 025, Wyoming · Built 1998 · 2 Lanes · 6 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
KWJ
Year Built
1998
Length
31.4 m (103 ft)
Max Span
30.8 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
6
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.