Pl Cnty Rd 269 over Chugwater Creek
5 Mi. S.E. Of Wheatland · County 031, Wyoming · Built 1998 · 1 Lanes · 18 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.001761, -104.922172
This bridge is in worse condition than 69.8% of bridges in County 031. The average bridge in Wyoming is 0 years old; this one is 28 years old.
Nearby Bridges
I-25 Service Road over Rock Creek
Built 1948
I-25 NBL and SBL over Rock Creek
Built 1975
I-25 NBL over I-25 East Service Road
Built 1970
I-25 SBL over WYO 34
Built 1970
WYO 316 over Chugwater Creek
Built 2003
8th Street over Canal No 2
Built 1950
15th Street over Canal No 2
Built 1950
US 87 Bus over I-25
Built 1975
WYO 316 over Rock / Wheatland Creek
Built 1999
12th Street over Canal No 2
Built 1950
Bridge Details
- Structure #
- KUU
- Year Built
- 1998
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 18
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,000
- Total Project Cost
- $39,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.