Cb Cnty Rd 3 over Third Sand Creek
11 Mi. Ne Of Elk Mountain · County 007, Wyoming · Built 1965 · 2 Lanes · 59 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.757644, -106.304947
This bridge is in worse condition than 90.8% of bridges in County 007. The average bridge in Wyoming is 0 years old; this one is 61 years old.
Nearby Bridges
Cb Cnty Rd 3 over Medicine Bow River
Built 1915
Cb Cnty Rd 320 over Sand Creek
Built 1985
Cb Cnty Rd 320 over Medicine Bow River
Built 1989
I-80 EBL over E F Medicine Bow River
Built 1969
I-80 EBL over CR 3/Elk Mtn-Med Bow Rd
Built 1969
I-80 WBL over CR 3/Elk Mtn-Med Bow Rd
Built 1969
I-80 WBL over E F Medicine Bow River
Built 1969
I-80 WBL over Medicine Bow River
Built 1968
I-80 EBL over Medicine Bow River
Built 1968
I-80 EBL over Machinery Pass
Built 1970
Bridge Details
- Structure #
- DMR
- Year Built
- 1965
- Length
- 15.2 m (49.9 ft)
- Max Span
- 9.1 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $208,000
- Total Project Cost
- $312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.