I-80 EBL over Campstool Road

Cheyenne Marginal · County 021, Wyoming · Built 1977 · 2 Lanes · 7,956 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
DBR
Year Built
1977
Length
44.5 m (146 ft)
Max Span
17.1 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
7,956
Material
Steel Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.