WYO 310 over I-25
Wheatland Marginal · County 031, Wyoming · Built 1975 · 2 Lanes · 1,453 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.059847, -104.965447
This bridge is in worse condition than 34.6% of bridges in County 031. The average bridge in Wyoming is 0 years old; this one is 51 years old.
Nearby Bridges
I-25 NBL over Canal No. 2
Built 1975
I-25 SBL over Canal No. 2
Built 1975
18th Street over Canal No 2
Built 1978
10th Street over Canal No 2
Built 1930
I-25 NBL over WYO 312 (South Street)
Built 1975
I-25 SBL over WYO 312 (South Street)
Built 1975
Water Street over Canal No 2
Built 1950
12th Street over Canal No 2
Built 1950
14th Street over Canal No 2
Built 1950
WYO 310 over Canal No. 2
Built 2015
Bridge Details
- Structure #
- CGT
- Year Built
- 1975
- Reconstructed
- 2004
- Length
- 70.1 m (230 ft)
- Max Span
- 31.4 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,453
- Material
- Steel Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.