I-80 EBL over CR 123-1 (Southwest Dr)
Cheyenne Marginal · County 021, Wyoming · Built 1965 · 2 Lanes · 10,938 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.115556, -104.843619
This bridge is in worse condition than 89.4% of bridges in County 021. The average bridge in Wyoming is 0 years old; this one is 61 years old.
Nearby Bridges
I-80 WBL over CR 123-1 (Southwest Dr)
Built 1965
La Cnty Rd 123-1 over Clear Creek
Built 1965
I-25 SBL over I-80
Built 1963
I-25 NBL over I-80
Built 1963
I-25 NBL over UPRR / US 30
Built 1963
I-25 SBL over UPRR / US 30
Built 1963
I-80 EBL and WBL over Unnamed Draw
Built 1965
I-25 SBL over Clear Creek
Built 1964
I-25 NBL over Clear Creek
Built 1964
Parsley Blvd over I-80
Built 2022
Bridge Details
- Structure #
- AYZ
- Year Built
- 1965
- Reconstructed
- 1979
- Length
- 34.1 m (111.9 ft)
- Max Span
- 14 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,938
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $7,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.