I-80 Service Road over Alkali Flat
Rock Springs Sunset Dr · County 037, Wyoming · Built 1953 · 2 Lanes · 1,840 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
41.581978, -109.252769
This bridge is in worse condition than 81.2% of bridges in County 037. The average bridge in Wyoming is 0 years old; this one is 73 years old.
Nearby Bridges
I-80 EBL and WBL over Alkali Flat
Built 1964
I-80 EBL over Dewar Drive
Built 2007
I-80 WBL over Dewar Drive
Built 2007
Sw Cnty Rd 51 over Sweetwater Creek
Built 1975
WYO 376 over Bitter Creek
Built 1977
College Drive over I-80
Built 1989
WYO 376 over UPRR
Built 1977
Grant Street over Bitter Creek
Built 2010
Interchange Road over I-80
Built 2022
Interchange Road over Bitter Creek
Built 1985
Bridge Details
- Structure #
- APT
- Year Built
- 1953
- Length
- 9.6 m (31.5 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 1,840
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.