I-25 SBL over CR 237-1 (Bristol Ridge)

Cheyenne - Chugwater · County 021, Wyoming · Built 1968 · 2 Lanes · 3,370 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
ACM
Year Built
1968
Length
28 m (91.9 ft)
Max Span
11.3 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
3,370
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.