I-25 NBL over La CR 218-2 (Farris Rd)
Cheyenne - Chugwater · County 021, Wyoming · Built 1970 · 2 Lanes · 3,363 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
41.261803, -104.841978
This bridge is in worse condition than 38% of bridges in County 021. The average bridge in Wyoming is 0 years old; this one is 56 years old.
Nearby Bridges
I-25 SBL over La CR 218-2 (Farris Rd)
Built 1970
La Cnty Rd 124-2 over Nine Mile Draw
Built 2008
La Cnty Rd 124-2 over Nine Mile Draw Tributary
Built 2008
La Cnty Rd 124-2 over Lodgepole Creek Trib
Built 2008
I-25 NBL over US 85
Built 1957
La Cnty Rd 220-1 over I-25
Built 1970
I-25 NBL over Machinery Pass
Built 1970
I-25 SBL over Machinery Pass
Built 1970
La Cnty Rd 124-2 over Lodgepole Creek Trib
Built 2008
WYO 211 over I-25
Built 1961
Bridge Details
- Structure #
- ABR
- Year Built
- 1970
- Length
- 40.8 m (133.9 ft)
- Max Span
- 17.1 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 3,363
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.