I-25 NBL over BNSF Railway

Cheyenne Marginal · County 021, Wyoming · Built 1958 · 3 Lanes · 12,642 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
ABE
Year Built
1958
Length
58.2 m (190.9 ft)
Max Span
26.1 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
12,642
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.