NORTHEAST ENTRANCE over SODA BUTTE CREEK
2.9 MI. WEST OF NE ENTRAN · County 029, Wyoming · Built 1934 · 2 Lanes · 1,982 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.991528, -110.056528
This bridge is in worse condition than 79.1% of bridges in County 029. The average bridge in Wyoming is 0 years old; this one is 92 years old.
Nearby Bridges
NORTHEAST ENTRANCE over DRY CREEK
Built 1936
NORTHEAST ENTRANCE over DRY CREEK
Built 1936
NORTHEAST ENTRANCE over DRY CREEK
Built 1936
NORTHEAST ENTRANCE over SODA BUTTE CREEK
Built 1934
COUNTY ROAD 280 over SODA BUTTE CREEK
Built 2022
BANNOCK TRAIL over WYOMING CREEK
Built 2022
NORTHEAST ENTRANCE over PEBBLE CREEK
Built 1934
SODA CR TR-REPUBLI over WOODY CREEK
Built 2022
LULU PASS TRAIL RD over POLAR STAR CREEK
Built 2002
LULU PASS ROAD over FISHER CREEK
Built 2002
Bridge Details
- Structure #
- 1570041P0000000
- Year Built
- 1934
- Length
- 32.8 m (107.6 ft)
- Max Span
- 15.3 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,982
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $4,076,000
- Total Project Cost
- $6,726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.