GRAND LOOP ROAD over BERYL SPRING OVERFLOW

8.2 MI. NE OF MADISON JCT · County 039, Wyoming · Built 1962 · 2 Lanes · 1,807 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1570006P0000000
Year Built
1962
Reconstructed
2002
Length
70.7 m (232 ft)
Max Span
7.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,807
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.