CTH ES (NATIONAL A over DEER CREEK

0.6M E JCT CTH O · County 133, Wisconsin · Built 1980 · 5 Lanes · 18,600 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
P67077100000000
Year Built
1980
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
5
Daily Traffic
18,600
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.