LRD JAY DR over N BR MILWAUKEE RIVER

0.8M E JCT CTH X · County 131, Wisconsin · Built 1978 · 2 Lanes · 750 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
P66003800000000
Year Built
1978
Length
12.4 m (40.7 ft)
Max Span
12.4 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
750
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$180,000
Total Project Cost
$271,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.