LRD SKUNK COULEE R over GRANT CREEK
0.9M N JCT STH 54 · County 121, Wisconsin · Built 1928 · 2 Lanes · 58 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.092667, -91.251917
This bridge is in worse condition than 87.3% of bridges in County 121. The average bridge in Wisconsin is 0 years old; this one is 98 years old.
Nearby Bridges
STH 54 over GRANT CREEK
Built 1977
LRD SMIKRUD RD over GRANT CREEK
Built 1940
LRD RIVER DRIVE over GRANT CREEK
Built 2000
STH 54 over HARDI CREEK
Built 1992
STH 54 over TOPPEN COULEE CREEK
Built 2000
USH 53 over BLACK RIVER
Built 1982
LRD BAKER RD over FLEMING CR
Built 2004
LRD SAMSON ROAD (D over DUTCH CREEK
Built 1980
LRD CRYSTAL VALLEY over BEAVER CREEK
Built 1990
USH 53 over BEAVER CREEK
Built 1996
Bridge Details
- Structure #
- P61022000000000
- Year Built
- 1928
- Length
- 9 m (29.5 ft)
- Max Span
- 8.2 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 58
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $104,000
- Total Project Cost
- $156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.