LRD HOLCOMB COULEE over HOLCOMB COULEE CREEK

2.7M E JCT STH 93 · County 121, Wisconsin · Built 1930 · 2 Lanes · 94 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
P61019400000000
Year Built
1930
Reconstructed
1967
Length
12.2 m (40 ft)
Max Span
11 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
94
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$128,000
Total Project Cost
$193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.