LRD S STAFFORD ST over MULLET RIVER
0.1M S JCT CTH C · County 117, Wisconsin · Built 1920 · 2 Lanes · 790 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
43.746494, -87.977711
This bridge is in worse condition than 95% of bridges in County 117. The average bridge in Wisconsin is 0 years old; this one is 106 years old.
Nearby Bridges
STH 67-MILWAUKEE S over MULLET RIVER
Built 1990
CTH EASTERN AVE. over MULLET RIVER
Built 1976
LRD FREDERICK ST ( over MULLET RIVER
Built 1981
STH 67 over MULLET RIVER
Built 1990
LRD SHORT CUT RD over MULLET RIVER
Built 1970
CTH PP over MULLET RIVER
Built 1994
STH 23 WB over STH 67
Built 2004
STH 23 EB over STH 67
Built 1985
STH 23 WB over SUNSET DRIVE/R/R
Built 2004
STH 23 EB over LRD SUNSET DRIVE | RR
Built 1985
Bridge Details
- Structure #
- P59070700000000
- Year Built
- 1920
- Length
- 10.5 m (34.4 ft)
- Max Span
- 9.6 m
- Width
- 17.5 m (57.4 ft)
- Lanes
- 2
- Daily Traffic
- 790
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.