LRD RIVERVIEW RD over MULLET RIVER
0.8M W JCT STH 67 · County 117, Wisconsin · Built 1919 · 2 Lanes · 47 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
43.76625, -87.991244
This bridge is in worse condition than 95% of bridges in County 117. The average bridge in Wisconsin is 0 years old; this one is 107 years old.
Nearby Bridges
STH 23 WB over SUNSET DRIVE/R/R
Built 2004
STH 23 EB over LRD SUNSET DRIVE | RR
Built 1985
STH 67 over MULLET RIVER
Built 1981
LRD RIVER HEIGHTS over MULLET RIVER
Built 1984
STH 23 EB over STH 67
Built 1985
CTH C over STH 23
Built 2005
STH 23 WB over STH 67
Built 2004
LRD WOODLAND RD over MULLET RIVER
Built 2019
STH 67-MILWAUKEE S over MULLET RIVER
Built 1990
LRD FREDERICK ST ( over MULLET RIVER
Built 1981
Bridge Details
- Structure #
- P59010400000000
- Year Built
- 1919
- Reconstructed
- 1966
- Length
- 9.4 m (30.8 ft)
- Max Span
- 8.9 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 47
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $107,000
- Total Project Cost
- $160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.