CTH OO over ONION RIVER
0.3M E JCT STH 32 · County 117, Wisconsin · Built 1931 · 2 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
43.652042, -87.821967
This bridge is in worse condition than 95% of bridges in County 117. The average bridge in Wisconsin is 0 years old; this one is 95 years old.
Nearby Bridges
STH 32 over ONION RIVER
Built 1990
CTH V over ONION RIVER
Built 1989
STH 32 over LIMA CREEK
Built 1990
CTH A over ONION RIVER
Built 1990
CTH W over TRIBUTARY OF ONION RIVER
Built 2022
IH 43 SB over LRD WILSON-LIMA RD
Built 1970
IH 43 NB over LRD WILSON-LIMA RD
Built 1970
CTH KK over IH 43
Built 1970
LRD OUR TOWN RD over ONION RIVER
Built 2007
CTH W over ONION RIVER
Built 1997
Bridge Details
- Structure #
- P59006900000000
- Year Built
- 1931
- Length
- 44.5 m (146 ft)
- Max Span
- 14.3 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $405,000
- Total Project Cost
- $608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.