LRD PROGRESSIVE RD over BR MAIN CREEK

1.2M S JCT CTH P-71 · County 107, Wisconsin · Built 1960 · 2 Lanes · 23 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P54010200000000
Year Built
1960
Length
8 m (26.2 ft)
Max Span
7.6 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
23
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.