LRD LEAF RD over N FK MAIN CREEK

0.4 MI E JCT EDMING RD · County 107, Wisconsin · Built 1978 · 2 Lanes · 595 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P54007900000000
Year Built
1978
Length
12.4 m (40.7 ft)
Max Span
12.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
595
Material
Prestressed Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.